EICR Certificate for Landlords: Every 5 Years, 6 Deadlines
An EICR certificate (Electrical Installation Condition Report) is needed at least every 5 years in every UK nation, or sooner if the last report says so. In England, tenants get a copy within 28 days, C1, C2 and FI faults must be fixed within 28 days, and councils can fine landlords up to £40,000.
Sound familiar? You let 25 properties, the EICRs were done in different years, the PDFs sit in three inboxes, and nobody is sure which tenants got a copy. Below are the rules for all four UK nations, then a fix you can finish this week.
Key takeaways
- Every 5 years at most in England, Wales, Scotland and Northern Ireland, or sooner if the last report says so.
- 28 days for tenants in England and Northern Ireland; 14 days in Wales; before the tenancy starts in Scotland.
- 28 days to fix C1, C2 and FI items in England, or sooner if the report says.
- Fines up to £40,000 in England, up from £30,000 since 1 November 2025.
- Database upload. England's landlord register, opening by region from 15 December 2026, will ask for your EICR.
- One afternoon to audit. One spreadsheet row per property and =EDATE(date,60) show every gap.
An EICR runs on a 5-year cycle, with several deadlines landlords should track.What is an EICR certificate?
An EICR certificate is the report an electrician produces after inspecting and testing a property's fixed wiring. Legally it is a report, not a certificate. It records the faults found and when the next inspection is due.
It covers the fixed installation, not the tenant's own appliances. In England the inspector must be "a person competent to undertake the inspection and testing", such as someone on the Registered Competent Person Electrical register.
How often is an EICR certificate required?
An EICR is required at least every 5 years, and more often if the most recent report says so. If an electrician writes "next inspection: 3 years" on the report, 3 years becomes your legal deadline for that property.
In England you need not re-inspect before re-letting if the report is still valid, though the guidance recommends a visual check before each new tenancy.
Who must get a copy of the EICR, and by when?
In England, existing tenants must get a copy within 28 days of the inspection, and new tenants before they move in. The council and prospective tenants have their own clocks too.
EICR deadlines for landlords in England (last verified 12 October 2026)
| Who or what | Deadline | Starts from |
|---|---|---|
| Next inspection and test | No more than 5 years, or sooner if the report says | Date of last inspection |
| Copy to each existing tenant | Within 28 days | Date of inspection |
| Copy to a new tenant | Before they occupy the property | Start of tenancy |
| Copy to a prospective tenant | Within 28 days | Their written request |
| Copy to the local housing authority | Within 7 days | The council's written request |
| Remedial or investigative work | Within 28 days, or sooner if the report says | Date of inspection |
| Written confirmation to tenants and council | Within 28 days | Completion of the work |
The four EICR clocks in England, from inspection to the next report.How do EICR rules differ across England, Wales, Scotland and Northern Ireland?
All four nations use a maximum 5-year cycle, but the tenant-copy deadline and the penalty differ, so tag every property with its nation. Every row below comes from the legislation.
EICR rules by UK nation, private rented homes (last verified 12 October 2026)
| England | Wales | Scotland | Northern Ireland | |
|---|---|---|---|---|
| Law | SI 2020/312 reg. 3, as amended by SI 2025/1043 | SI 2022/6 (W. 4) reg. 6 | Housing (Scotland) Act 2006, s.19A and 19B | SR 2024/201 reg. 3 |
| Who must get one | Private landlords; social landlords too since 1 November 2025 | Landlords under an occupation contract | Private landlords | Private landlords (not social housing) |
| How often | No more than 5 years, or the report's earlier date | Report valid 5 years, or until the report's earlier date | No more than 5 years between inspections | No more than 5 years, or the report's earlier date |
| Copy to tenant | Within 28 days of inspection; new tenants before they move in | Within 14 days of the occupation date; within 14 days of later inspections | Before the tenancy starts; a copy of any inspection during it | Within 28 days of inspection; new tenants before they move in |
| Copy to council | Within 7 days of a written request | No duty in reg. 6 | No duty in s.19A | Within 7 days of a written request |
| Remedial work | Within 28 days, or sooner if the report says | No fixed period in reg. 6; written confirmation to tenant within 14 days of receiving it | No fixed period in s.19A; must meet the repairing standard | Within 28 days, or sooner if the report says |
| If you don't comply | Council financial penalty up to £40,000 | Home treated as unfit for human habitation | Tenant or council can apply to the First-tier Tribunal | Criminal offence: fine up to level 5 (£5,000) |
| Official link | legislation.gov.uk/uksi/2020/312 | legislation.gov.uk/wsi/2022/6/regulation/6 | legislation.gov.uk/asp/2006/1/section/19A | legislation.gov.uk/nisr/2024/201 |
| Last verified | 12 Oct 2026 | 12 Oct 2026 | 12 Oct 2026 | 12 Oct 2026 |
Scotland's duty also covers fixtures, fittings and appliances the landlord supplies, and records must be kept for 6 years. Northern Ireland's rules apply to new private tenancies from 1 April 2025, and existing ones needed a first inspection by 1 December 2025.
EICR rules in the four UK nations at a glance. Free to embed with a link back to this page.What do EICR codes C1, C2, C3 and FI mean?
C1 and C2 mean the installation is unsafe or potentially unsafe and must be fixed. C3 is advice only, and FI means investigate without delay. Any C1 or C2 makes the report state the installation is unsatisfactory for continued use.
EICR codes explained
| Code | What it means | Do you have to act? |
|---|---|---|
| C1 | Danger present. Risk of injury. | Yes. It may be made safe on the day; the repair is still needed. |
| C2 | Potentially dangerous. | Yes. Within 28 days in England, or sooner. |
| FI | Further investigation required without delay. | Yes. Investigate within 28 days in England, or sooner. |
| C3 | Improvement recommended. | No. The report can still be satisfactory. |
What happens if the EICR is unsatisfactory?
In England, a qualified person must do the work within 28 days of the inspection, or sooner if the report says. The clock starts on the inspection date, not the day the PDF arrives. Then follow this decision tree.
- No codes, or C3 only: send tenants their copy and enter the next due date. C3 work is optional.
- C1: check whether the inspector made it safe before leaving (the guidance allows this), then book the permanent repair.
- C2 or FI: book the repair or investigation inside the deadline. If it finds more work, the steps repeat.
- Work finished: get written confirmation from the qualified person (a satisfactory EICR or a Minor Electrical Installation Works Certificate both count). Send it, with the report, to every tenant and the council within 28 days of completion.
⚠️What happens if you miss it: in England, a local housing authority satisfied beyond reasonable doubt that a landlord breached these duties can impose a financial penalty of up to £40,000, and more than one for a continuing failure. If urgent work is not done, the council can arrange it, with the tenant's consent and 48 hours' notice, and recover the cost.
What if a tenant refuses access for the EICR?
In England you are not in breach if you can show you took all reasonable steps to comply, and not taking the tenant to court does not, on its own, count against you. The burden is on you, so build evidence.
The guidance says to keep copies of all communications about access, plus previous safety reports. In practice:
- Write first, offering two dates (template below).
- Log every attempt: date, channel and reply. Try a call if an email goes unanswered.
- File the log with the previous EICR and any electrical work certificates.
Access letter: "Dear [name], the electrical safety inspection for [address] is due by [date]. An electrician from [company] can visit on [date 1] or [date 2]. Please confirm one by [date], or suggest another time. Thank you, [name, phone]."
What is changing for EICRs in 2026 and 2027?
Two changes in England matter now. First, social landlords: for social tenancies granted before 1 December 2025, the first inspection must happen before 1 November 2026, which is weeks away.
Second, the private rented sector database created by the Renters' Rights Act. Registration opens region by region from 15 December 2026 (West Midlands first), and every region's deadline falls by 14 November 2027. For each property you upload the EICR (or Electrical Installation Certificate) and its expiry date, and pay £65 a year. Our Renters' Rights Act checklist has the full regional timetable.
How do you find every EICR in your portfolio in one afternoon?
Do this now, with no software: pull every report into one folder, type one row per property into the layout below, and let the formulas flag what is due. Roughly, 30 properties take 3 to 4 hours, mostly spent hunting for PDFs.
- Gather the reports (60 to 90 minutes). Search email for "EICR" and each electrician's name, then shared drives.
- Type one row per property (about 3 minutes each), with dates from the report, never memory.
- Act on red rows this week. Book electricians for anything due within 90 days and send missing tenant copies.
EICR audit spreadsheet layout
| Column | Heading | What to enter or formula |
|---|---|---|
| A | Property | Address and nation |
| B | Inspection date | From the report |
| C | Next date on report | Date the electrician wrote; blank if none |
| D | Next due | =IF(C2="",EDATE(B2,60),MIN(C2,EDATE(B2,60))) |
| E | Days left | =D2-TODAY() |
| F | Codes found | For example "C2 x2, FI x1" |
| G | Remedial deadline | =B2+27 if any C1, C2 or FI (or the report's earlier date) |
| H | Confirmation sent | Date sent to tenants and council |
| I | Tenant copy sent | Date and method |
| J | Council copy | Date requested and date sent |
| K | Owner | Person responsible, plus a backup |
Why +27? Counting the inspection day as day 1 of the 28 is the cautious reading. Use it for the tenant copy too, in England and Northern Ireland. In Wales the copy is due within 14 days starting with the day the inspection was completed: use =B2+13.
Then add conditional formatting (custom formula):
- Red: =$E2<=30, overdue or due within 30 days.
- Amber: =AND($E2>30,$E2<=90), book the electrician now.
- Red: =AND($G2<>"",$H2="",$G2-TODAY()<=7), remedial work due within a week.
Worked example (illustrative dates). An inspection on 3 March 2026 finds one C2, and the report sets the next inspection for 3 March 2029. Column D shows 2029, not 2031. The remedial and tenant-copy target is 30 March 2026, and the row turns amber on 3 December 2028.
Prefer it ready-made? The free landlord compliance tracker gives each EICR, gas and EPC check a book-by date and colour-coded status.
💡 Pro Tip
Letting agencies that use ExpiryEdge often set each property up as its own group, with every certificate tracked against it. The habit worth copying, with or without software: the day a new EICR arrives, create the next one with its due date from the report. Re-keying renewals later is where items slip.
How do you book electricians without a last-minute scramble?
Start booking about 8 to 10 weeks before the due date. That is our suggestion, not a legal rule, hence a 90-day reminder.
- Batch by area. Group properties due in the same quarter by postcode and ask one electrician to quote for the run.
- Line up gas and electrics. If the annual gas safety check falls in the same month, one letter covers both.
- Get remedial prices up front, so you can approve small fixes on the day, and ask for the PDF within days: every 28-day clock runs from the inspection date.
What are the most common EICR mistakes?
Most EICR problems are date mistakes, not wiring mistakes.
Common EICR mistakes and how to fix them
| Mistake | Fix |
|---|---|
| Adding 5 years when the report set a shorter interval | Use the earlier date: =MIN(C2,EDATE(B2,60)) |
| Forgetting the council after remedial work | Send written confirmation to tenants and council within 28 days of completion |
| Running a Welsh property on England's 28 days | Tag the nation; Wales uses 14 days |
| Filing the new EICR but not updating other records | Update your tracker and, once your region opens, the landlord database |
How should you track EICR expiry: spreadsheet or software?
If one person manages fewer than about 10 to 15 properties and checks the sheet weekly, the spreadsheet is enough. A tool earns its place when:
- You have dozens of properties, each also with a gas check every 12 months and an EPC valid for 10 years.
- Several staff share the work, or the person who built the sheet leaves.
- You need proof fast. A council request in England gives you 7 days.
ExpiryEdge is one way to do this at scale: each EICR is a record with an owner, a backup, the PDF and reminders at 90, 60, 30 and 7 days by email, SMS, Slack or Teams, and it renews as a copy when you close it. See how it works for letting agents and landlords or across property management compliance.
EICR checklist for each rental property
- ✓
Valid EICR on file, within 5 years or the shorter interval on the report
- ✓
Tenant copy within 28 days of inspection (14 days in Wales), and to new tenants before they move in
- ✓
C1, C2 and FI work done within 28 days of inspection (England)
- ✓
Written confirmation sent to tenants and council within 28 days of the work
- ✓
Next EICR booked 8 to 10 weeks ahead
Frequently asked questions
How often is an EICR required for a rental property?
At least every 5 years in England, Wales, Scotland and Northern Ireland, or sooner if the most recent report sets a shorter interval. Use the date on the report.
How long do I have to give tenants a copy of the EICR?
In England and Northern Ireland, existing tenants must get a copy within 28 days of the inspection, and new tenants before they move in. In Wales the deadline is 14 days. In Scotland, tenants get a copy before the tenancy starts.
What is the fine for not having an EICR?
In England, the local housing authority can impose a financial penalty of up to £40,000, and more than one penalty for a continuing failure. The cap was £30,000 before 1 November 2025. In Northern Ireland a breach is a criminal offence with a fine of up to £5,000.
Does a C3 code mean my EICR has failed?
No. C3 means improvement recommended, and a report with only C3 items can still be satisfactory. C1 or C2 makes the report unsatisfactory, and in England the work must be done within 28 days or sooner.
What if my tenant refuses access for the EICR?
In England you are not in breach if you can show you took all reasonable steps to comply, and not going to court for access does not on its own count against you. Keep copies of every letter, email and call, plus previous safety reports.
Will I have to upload my EICR to the new landlord database?
Yes, in England. The private rented sector database opens region by region from 15 December 2026, and landlords will upload a copy of the EICR or Electrical Installation Certificate and its expiry date for each property.
Sources
- SI 2020/312, regulation 3 (England), legislation.gov.uk
- SI 2020/312, regulation 11 (penalties), legislation.gov.uk
- SI 2025/1043 (amending regulations), legislation.gov.uk
- Electrical safety standards guidance, GOV.UK
- SI 2022/6 (W. 4), regulation 6 (Wales), legislation.gov.uk
- Fitness for human habitation guidance, GOV.WALES
- Housing (Scotland) Act 2006, section 19A, legislation.gov.uk
- Housing (Scotland) Act 2006, section 19B, legislation.gov.uk
- Housing (Scotland) Act 2006, section 22, legislation.gov.uk
- Repairing Standard statutory guidance, gov.scot
- SR 2024/201 (Northern Ireland), legislation.gov.uk
- Electrical safety standards, Department for Communities (NI)
- Get ready to register, MHCLG Housing Hub
Last reviewed: 12 October 2026
Frequently asked questions
In England and Northern Ireland, existing tenants must get a copy within 28 days of the inspection, and new tenants before they move in. In Wales the deadline is 14 days. In Scotland, tenants get a copy before the tenancy starts.
In England, the local housing authority can impose a financial penalty of up to £40,000, and more than one penalty for a continuing failure. The cap was £30,000 before 1 November 2025. In Northern Ireland a breach is a criminal offence with a fine of up to £5,000.
No. C3 means improvement recommended, and a report with only C3 items can still be satisfactory. C1 or C2 makes the report unsatisfactory, and in England the work must be done within 28 days or sooner.
In England you are not in breach if you can show you took all reasonable steps to comply, and not going to court for access does not on its own count against you. Keep copies of every letter, email and call, plus previous safety reports.
Yes, in England. The private rented sector database opens region by region from 15 December 2026, and landlords will upload a copy of the EICR or Electrical Installation Certificate and its expiry date for each property.